Timeline for manufacturing bespoke tins

Pre-Clock Concept You need to decide how you want to present your product and if tin is the right packaging medium.
Pre-Clock Design You an prepare your own designs or select one of our “off the shelf” solutions. Once you have your designs ready you can upload them to our FTP site: FTP E-MAIL
Clock starts Artwork proofing Receipt of signed final proof in Hong Kong
5 days Technical We take the design to our factory to assess the best way to print and manufacture your tin. It is at this point that we may come back to you with recommendations.
10 days Metal proofing We will supply you with a paper proof for your approval; manufacturing will not start until this proof is signed off. Should you require we can make a metal proof.. This will add 14 days to the lead time.
60 days Manufacture Manufacturing takes 60 days from the sign off of the paper proof. THIS CAN BE AS MUCH AS 90 DAYS IN PEAK SEASON (June, July & August)
Including AC & Packaging EVERY tin is cleaned and inspected by hand. We discard anything that is not perfect and supply you with only the best. The tins are normally packed into poly bags, into inner's and then transit outers. The tins are then loaded into a container and sent to you
30 days Delivery This takes around 30 days to Europe and 21 days to the US from the departure of the goods from China.